Gas Drainage Remote Well Head Monitoring System

  • Mining & Minerals

Gas Drainage Remote Well Head Monitoring System

Triple i completed the design, procurement, installation, setup and commissioning of remote monitoring and control equipment. The project was performed on a schedule of rates, based on a budget estimate.

Scope

  • Develop electrical design and software functionality to meet customer requirements.
  • Design control and instrumentation systems to meet site conditions.
  • Develop Wireless Communication Network to allow access to remote site.
  • Supply & Install Fibre for installation from Main PLC to Plant Network.
  • Rewire and retrofit existing panels with equipment required.
  • Carry out all instrumentation tubing to valves.
  • Perform Hazardous Area Installation & Compliance checks.
  • Integrate with existing system on site.
  • Perform Site Acceptance Testing of system with customer.

Control Systems

  • Allen-Bradley Logix 5000 & Point I/O over radio with Citect SCADA
  • Wireless Network – Prosoft ILX2-IHW-A & ILX34-AENWG radios

Deliverables

  • New controls for remote monitoring and control of equipment.
  • Installation complete on time and on budget.
  • Cost and performance targets were all met.
  • Changeover of system & support provided during initial few weeks of operation.